Project — Commercial
Gallery North
Oslo, Norway
Project dossier
- Client
- Gallery North AS
- Location
- Oslo, Norway
- Industry
- Commercial
- Scope
- Architectural joinery package: oak wall panelling, metal-mesh ceiling rafts, laminated glass partitions
- Scale
- Commercial gallery and offices, 4,200 m²
- Status
- Delivered 2026
- Delivery timeline
- RFQ to final drop: 24 weeks
- Cost band
- USD 860K–1.1M joinery package
Designed by
Nordkap Arkitektur
Procured by
Bygg Partner Procurement
Owner / operator
Gallery North AS
Overcoming challenges
The brief, and how we landed it
The challenge
The main contractor's programme gave the joinery package a sequence of 11 just-in-time drops — material arriving early had nowhere to be stored, and late material idled a whole trade crew. The architect's oak veneer spec was a European-sourced product at a price and lead time the budget could not carry. Winter shipping to Oslo demanded weatherproof crating and heated quay handling.
How we delivered
We sourced and qualified an equivalent veneer, running side-by-side sample panels for the architect's approval against the original. All 11 drops were produced, cut-to-size and packed as zone-labelled kits matched to the contractor's sequence, shipped on a rolling schedule from our buffer stock. Glass and mesh panels shipped in weatherproof crates with handling instructions accepted by the Oslo terminal.
Scope of supply
What left our loading dock
Supply list
- Cut-to-size oak wall panelling, 2,900 m²
- Metal-mesh ceiling rafts, framed and numbered
- Laminated glass partitions, 46 panels
- 11 just-in-time drops as zone-labelled kits
- Weatherproof crating with terminal-accepted handling instructions
Materials used
- Oak Veneer
- Metal Mesh
- Glass
Value engineering on this project
The qualified veneer equivalent landed 33% below the specified European material while passing the architect's side-by-side panel review. Nesting all cut-to-size panels in our CNC programming raised board yield from 71% to 86%, funding the buffer-stock programme at no extra cost. Zone-labelled kit packing let the contractor's crew install straight from the crate, removing their quoted sorting labour.