Sculpted Curve Bar, Harbourfront Hotel

Project — Hospitality

Sculpted Curve Bar, Harbourfront Hotel

Singapore

Project dossier

Client
Harbourfront Hospitality Pte Ltd
Location
Singapore
Industry
Hospitality
Scope
12 m serpentine bar counter in curved laminated timber with stone top and brass reveal + back-bar joinery
Scale
Boutique hotel, 180 keys
Status
Delivered 2026
Delivery timeline
RFQ to delivery: 16 weeks
Cost band
USD 120K–160K
Sample data

Designed by

Atelier Lume

Procured by

Straits Procurement Partners

Owner / operator

Harbourfront Hospitality Pte Ltd

Overcoming challenges

The brief, and how we landed it

The challenge

The designer's bar was a continuous 12-metre serpentine with double curvature in plan and elevation, a 40 mm stone top following the same curve, and a 6 mm brass reveal running the full perimeter. Three factories returned declines or a 26-week lead time; the two that priced it quoted split straight modules with visible joints. The opening was in 19 weeks.

How we delivered

We built full-scale templates from the designer's 3D model, then formed the serpentine carcass as four sections on laminated curved formwork, each dry-fitted to the next on our floor with joints placed on the designer's sightlines. The stone top was CNC-cut to the merged model, and the brass reveal was rolled to radius and fitted against the signed control sample. The four sections were trial-assembled complete with top and reveal, photographed, then crated as numbered modules.

Scope of supply

What left our loading dock

Supply list

  • 12 m serpentine bar counter in four curved sections, dry-fitted and numbered
  • 40 mm stone top, CNC-cut to the merged 3D model
  • 6 mm rolled-brass reveal, radius-formed
  • Back-bar joinery and bottle displays to match
  • Trial assembly with photo record and node drawings for local contractor

Materials used

  • Curved Laminated Timber
  • Marble
  • Brass
  • PU Lacquer

Value engineering on this project

Forming the carcass on reusable laminated formwork instead of solid sculpted timber cut material cost on the curve by roughly 35% and kept the counter weight within the floor loading limit. Placing the three joints on the designer's sightlines avoided the visible straight-module compromise quoted elsewhere. Trial assembly in the factory brought the install to four days for the local crew, against the two weeks the main contractor had scheduled.

The pieces

Supplied from our lines

Planning something similar?

Share the drawings and the budget frame — we will show you exactly how we would build it.