Royal Palm Hotel

Project — Hospitality

Royal Palm Hotel

Dubai, UAE

Project dossier

Client
Royal Palm Hospitality Group
Location
Dubai, UAE
Industry
Hospitality
Scope
Atrium feature wall and reception joinery + 214 keys' casegoods + lobby wall and floor surfaces
Scale
5-star, 214 keys
Status
Delivered 2025
Delivery timeline
RFQ to delivery: 19 weeks
Cost band
USD 1.2M–1.6M FF&E
Sample data

Designed by

Meridian Studio Interiors

Procured by

Cedar Lane Procurement

Owner / operator

Royal Palm Hospitality Group

Overcoming challenges

The brief, and how we landed it

The challenge

The general contractor's fit-out programme slipped by six weeks, but the opening date was fixed by the owner's franchise commitment. The original spec called for book-matched marble across 2,400 m² of lobby surfaces at a price that had already blown the FF&E budget line. FF&E had to clear customs and reach the site before the tower crane was dismantled, leaving a hard delivery window.

How we delivered

We consolidated the atrium millwork, casegoods and stone surfaces under one production schedule and one QC regime. The 14-metre atrium feature wall was split into 14 numbered panels, trial-assembled in the factory, and packed with node drawings for the local contractor. Lobby surfaces were re-specified to large-format sintered stone, cut and dry-laid in-house before crating. Two staggered container waves landed within the crane window.

Scope of supply

What left our loading dock

Supply list

  • 14-panel atrium feature wall in book-matched walnut veneer with brass inlay, trial-assembled and numbered
  • 214 guestroom casegoods packages: wardrobes, credenzas, minibar units
  • 2,400 m² large-format sintered stone, cut-to-size and dry-laid
  • Lobby credenzas and reception desk in walnut veneer
  • Quartz vanity tops for 214 bathrooms
  • Modular crating with node drawings and installation manual for local contractor

Materials used

  • Sintered Stone
  • Brass
  • Walnut Veneer
  • Quartz
  • Textiles

Value engineering on this project

Replaced book-matched marble with 6 mm sintered stone slabs, cutting surface cost by roughly 38% while keeping the design intent of continuous veining. Casegood carcasses were re-engineered from solid framing to veneered engineered board with the same reveal details, saving 12% on the furniture line. Pre-agreed interface drawings with the local fit-out contractor avoided on-site re-work.