Bistro Renard

Project — Retail

Bistro Renard

Paris, France

Project dossier

Client
Groupe Renard
Location
Paris, France
Industry
Retail
Scope
Dining chairs, tables, and banquettes for 14 bistro sites
Scale
Restaurant group, 14 sites, 1,100 covers
Status
Delivered 2025
Delivery timeline
RFQ to final site: 28 weeks
Cost band
USD 290K–360K
Sample data

Designed by

Maison Ferreol

Procured by

Groupe Renard

Owner / operator

Groupe Renard

Overcoming challenges

The brief, and how we landed it

The challenge

The group's previous chair supplier had failed in service — joint failures within nine months across three sites. The roll-out budget assumed a price point 15% below the original tender. Sites ranged from 40 to 120 covers, each needing a different mix of chairs, tables, and banquettes on a six-month roll-out calendar.

How we delivered

We prototyped the chair in 10 days and put it through 100,000-cycle contract testing before sign-off, with joint details re-engineered from the failed reference. One chair platform and one table base system served all 14 sites, with site kits packed per seating plan. Two production waves matched the roll-out calendar, each site receiving numbered cartons and assembly drawings for the local fitter.

Scope of supply

What left our loading dock

Supply list

  • Dining chairs, one contract-tested platform, 980 units
  • Table bases in three heights, quartz tops cut-to-size
  • Modular banquettes, 1.2 m repeat with site-specific ends
  • Site kits packed per seating plan, numbered cartons
  • Two production waves matched to roll-out calendar

Materials used

  • Oak
  • Metal
  • Textiles
  • Quartz

Value engineering on this project

Replacing the specified steam-bent components with CNC-laminated rails held the silhouette while cutting unit cost by 17% and improving joint reliability. One table base in three heights removed two extra base designs from the tooling budget. Banquettes were re-engineered as repeated 1.2 m modules with site-specific end panels, so 14 unique runs became one production batch.

The pieces

Supplied from our lines

Planning something similar?

Share the drawings and the budget frame — we will show you exactly how we would build it.