Regional Medical Centre Fire Doors

Project — Commercial

Regional Medical Centre Fire Doors

Frankfurt, Germany

Project dossier

Client
Nordrhein Klinikgruppe
Location
Frankfurt, Germany
Industry
Commercial
Scope
220 fire door sets across Ei 30 and Ei 60 positions: escape routes, clinical corridors, wet treatment and sanitation areas
Scale
Hospital extension, 14,000 m²
Status
In production
Delivery timeline
PO to final zone: 26 weeks
Cost band
USD 260K–340K doors package
Sample data

Designed by

Raumplan Health Studio

Procured by

Bygg Partner Procurement

Owner / operator

Nordrhein Klinikgruppe

Overcoming challenges

The brief, and how we landed it

The challenge

The extension mixed dry clinical corridors needing Ei 60 on escape routes with wet treatment rooms where wooden leaves had swollen in the existing building within five years. Hygiene protocols required seamless, cleanable door faces and documentation for every position. Site access ran through the operating hospital, so deliveries came in zone-sized lots on two days' notice.

How we delivered

We split the programme into two door lines: Ei 60 wooden leaves with lacquered faces for escape routes and dry corridors, and WPC leaves for wet and hygiene areas — seamless faces that tolerate hospital cleaning chemicals and will not swell or rot. All doors ran one CE-marked hardware standard so the facilities team carries one spare-parts kit. Deliveries ship as zone-labelled sets on two days' notice against the clinical move plan.

Scope of supply

What left our loading dock

Supply list

  • 220 fire door sets across Ei 30 and Ei 60 positions
  • WPC doors for wet treatment rooms and sanitation zones, seamless cleanable faces
  • Wooden doors lacquered and veneered for dry corridors and offices
  • One CE-marked hardware standard across all leaves
  • Zone-labelled deliveries on two days' notice against the clinical move plan

Materials used

  • WPC
  • PU Lacquer
  • Oak Veneer
  • Steel-reinforced Hardwood

Value engineering on this project

Moving wet-area doors from lacquered wooden leaves to WPC removed the repaint cycle the existing building carries every four years and cut the door package cost by roughly 9%. One hardware standard across 220 doors cut hardware cost 14% against the tendered mix. Zone-sized deliveries eliminated off-site storage, which the local quote had priced at a per-week rate.