NOMA Flagship Store

Project — Retail

NOMA Flagship Store

Copenhagen, Denmark

Project dossier

Client
NOMA Retail Group
Location
Copenhagen, Denmark
Industry
Retail
Scope
Display fixtures, cash-wrap counters, fitting-room furniture + stone and metal surfaces
Scale
Flagship retail, 900 m²
Status
Delivered 2026
Delivery timeline
RFQ to delivery: 15 weeks
Cost band
USD 320K–420K fixtures
Sample data

Designed by

Bjorn & Fell Studio

Procured by

NOMA Retail Group

Owner / operator

NOMA Retail Group

Overcoming challenges

The brief, and how we landed it

The challenge

The landlord's licence-to-alter allowed only six weeks of fit-out before the lease handback penalty kicked in. The design called for solid marble display plinths that weighed over 300 kg each — above the mall's floor loading limit. Late design changes during production threatened to derail the programme twice.

How we delivered

We re-engineered the plinths as marble-clad honeycomb cores at 68 kg each, approved by the mall's structural engineer on first submission. Fixtures were produced as pre-assembled, pre-wired modules so the local shopfitter only had to level and connect. A weekly change-control call with the design team kept the two late revisions inside the schedule by re-sequencing the paint and assembly lines.

Scope of supply

What left our loading dock

Supply list

  • Marble-clad honeycomb display plinths, 12 units
  • Pre-wired cash-wrap counters, 3 units
  • Fitting-room furniture: benches, mirrors, garment rails
  • Sintered stone wall cladding panels, cut-to-size
  • Pre-assembled modules with levelling drawings for local shopfitter

Materials used

  • Marble
  • Sintered Stone
  • Metal
  • Glass
  • Oak

Value engineering on this project

Swapping solid marble for 5 mm stone on aluminium honeycomb cut plinth weight by 78% and material cost by 52%, and removed the need for floor reinforcement. Cash-wrap counters were standardised on one carcass with interchangeable front panels, so a late finish change became a panel swap rather than a rebuild. Pre-wiring lighting in the factory removed two on-site trades from the six-week programme.